Hallmarc #SIX File Cabinet

This is the project file cabinet which contains all the files, documents, reports and guidelines relevant to the project team. The file cabinet will be constantly updated throughout the project. Some files may be stored within folders in this cabinet. Please follow the VIEW links to open the files.

Important Note: This cabinet is only accessible to persons who have the link and will not appear in internet search results. This link must be shared only with project team members and trusted colleagues. Report any issues to vinoth@ytenterprises.com
File nameDescriptionSizeRev.TimeUser
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
ċ

View
Folder containing all Minutes of Meeting held since January 2014 as supplied by all stakeholders.  20 Mar 2015, 08:40 Yusuf Turab
ċ

View
Credit wise green building plan and project description.  20 Mar 2015, 07:47 Yusuf Turab
ċ

View
This is a key project guideline to all stakeholders.  20 Mar 2015, 07:54 Yusuf Turab
ċ

View
Folder containing all photos from project site during construction phase.  26 Mar 2015, 06:42 Yusuf Turab
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
ċ

View
Owner project requirements and request for proposal document for MEP commissioning  26 Mar 2015, 07:32 Yusuf Turab
ċ

View
Whole building energy analysis and performance modelling report to meet the requirements of EEc1.  20 Mar 2015, 08:12 Yusuf Turab
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
ċ

View
Detailed daylighting report for entire building.  20 Mar 2015, 08:14 Yusuf Turab
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
ċ

View
This document provides the general material procurement guidelines for the IGBC Green NB rating system.  20 Mar 2015, 08:19 Yusuf Turab
ċ

View
This form is used to record all materials used in the project along with their respective sustainability attributes. Includes construction waste management.  20 Mar 2015, 08:24 Yusuf Turab
ċ

View
Summarised view of materials data entered by all stakeholders.  20 Mar 2015, 08:26 Yusuf Turab
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
ċ

View
This is a map showing the project location and all basic amenities within 1Km walking distance. Meets requirement for SSc1  20 Mar 2015, 08:16 Yusuf Turab
Ā
View
Guideline to the site in-charge to ensure GB compliance at the site.  20 Mar 2015, 08:27 Yusuf Turab
Comments