Mount Royale

BuildScape has provided an integrated Waterproofing and Root Barrier system at Mount Royale. Green courtyards with planter boxes have been planned in two of the buildings on the first floor. These planter boxes have been provided a four layer waterproofing and root barrier treatment using the most high quality Dr. Fixit products.
  • We carried out a through cleaning of the boxes along with water wash
  • Two coats of Dr. Fixit Fastflex which is a high performance polymer modified cementitious waterproof coating
  • Two coats of Coal Tar Epoxy to provide the strongest root barrier

This system is expected to last over 15 years under most conditions.


Comments